The newest trail section is now open in Sunbury. For northbound, you can pick up the new trail at Cherry Street at location 40.242711, -82.852419. The trail goes over the Big Walnut Creek and has nice bump outs for viewing areas.
Even with this new trail, there will still be a 1/2 mile street connector section for the near future. The street route is much shorter and is 2 streets instead of 4 before.
Here is a Ride with GPS for the remaining 1/2 mile road connection.
https://ridewithgps.com/trips/124524128
We have added supplemental panels for our map sets that can be downloaded to show the new trail section. Scroll down for the download buttons, the new Ride with GPS files as well as rider perspective videos for both directions.
More photos are posted on the Preservation Parks facebook page:
Pres Parks FB post and Ribbon Cutting
Sharing helpful videos from Dwight Bowman with a riders view time lapse of the new route through Sunbury. Both northbound and southbound are provided.
Northbound route:
https://youtu.be/cIcqEQi8wxA
Southbound route:
https://youtu.be/eTqt7gCUXg0
MAP PANEL UPDATES
Did you order the 2022 version of our Trail Map?
Here are the files you can download and print out so you have an updated map for this Sunbury trail addition.
UPDATED RIDE WITH GPS FILES ARE AT
ohiotoerietrail.org/OTET_RWGPS or
RWGPS